Our Facility
Located in Tuzla Aydınlı Bay, our facility has a total area of 25,000 m², of which 5,000 m² is closed and 20,000 m² is open areas. There are 3 slipways, 1 floating dock and pier in our facility with a total pier service of 750 meters. We serve vessels up to 30,000 DWT on our pier and up to 9,000 DWT on the dock and slipways. In our facility, which has reached a ship maintenance and repair capacity of 20 million DWT since its establishment, we make the right plans with our experienced team, serve 20 ships at the same time and repair an average of 150 ships a year.